Perbaikan Proses Bisnis Logistik Sampah di Kota Cirebon Menggunakan Metode Business Process Improvement (BPI)

Sutandi Sutandi

Abstract


One of the main issues in the city of Cirebon is the problem of waste management. The City of Cirebon's Environmental Service is tasked with managing waste from Households and Industries to the Garbage Collection Site (TPS) to the Final Disposal Site (TPA). The business process of transporting waste from TPS to TPA still often experiences obstacles, one of which is the delay in transportation from TPS to TPA because it does not pay attention to the connectivity of waste flow and information flow as a single entity that forms a waste logistics network. The purpose of this study is to propose the design of waste logistics policy through improving the waste logistics business process. The research method applied by using the fishbone diagram and five whys analysis methods sourced from interviews, and field observations in finding the fundamental problems of each business process. The basic problem based on the results of the analysis is the accumulation of waste at the TPS. With the results of observations it will be designed improvements with streamlining tools analysis tools on Business Process Improvement (BPI) in presenting business process recommendations. Based on business process recommendations, then run a simulation to see performance improvements for each business process, with an increase in the performance of garbage delivery trucks from TPS to TPA by 34.31% so as to reduce the accumulation of waste in TPS.

Full Text:

PDF

References


. Abreu, J., 2013. Business Processes Improvement on Maintenance Management: a Case Study. Universidade do Algarve Portugal.

. Andiç ̧ E., Yurt, O. and Baltacıoğlu, T., Green Supply Chains: Efforts and Potential Applications for The Turkish Market, Resources, Conservation and Recycling, 58,

. 2012, pp. 50– 68. Anwar, SN. (2011). Manajemen Rantai Pasokan (Supply Chain Management) Konsep dan Hakikat.Jurnal Dinamika Informatika, Vol 3 No 2. [e-jurnal]. doi: http://www.unisbank.ac.id/ojs/index.php/fti2/a rticle/view/1315/531

. Bizagi, 2018. Simulation in Bizagi. [online] Tersedia di: < http://help.bizagi.com/process-modeler/en/index.html?simulation_in_bizagi.htm> [Diakses pada 11 November 2019]

. Chen, C. C., Shih, H. S., Shyur, H. J. and Wu, K. S., A Business Strategy Selection of Green Supply Chain Management via Analytic Network Process, Computers and Mathematics with Applications, 64, 2012, pp. 2544–2557.

. Chopra, S. dan Meindl, P. 2004. Supply Chain Management: Strategy, Planning and Operations, 2nd Edition. Upper Saddle River, NY: Prentice-Hall

. Eltayeb, T. K., Zailani, S. and Ramayah, T., Green supply chain initiatives among certified companies in Malaysia and environmental sustainability: Investigating the outcomes, Resources, Conservation and Recycling, 55, 2011, pp. 495–506.

. Huang, X., Tan, B. L. and Ding, X., Green Supply Chain Management Practices: A Sectoral Investigation Into Manufacturing SMEs in China, 2012 International Conference on Economics, Business and Marketing Management, 29, 2012, pp. 147–151.

. Kusuma, I., 2015. Perbaikan Proses Bisnis Penyusunan Rencana Kerja Dinas Pemuda Olahraga dan Pariwisata Kabupaten Bandung Menggunakan Metode Business Process Improvement Untuk Memenuhi Peraturan Menteri Dalam Negeri No. 54 Tahun 2010 dan Klausul 7.3 ISO 9001:2008. S1. Universitas Telkom Bandung.

. Lee, S. M., Kim, S. T. and Choi, D., Green Supply Chain Management and Organizational Performance, Industrial Management & Data Systems, 112(8), 2012, pp. 1148-1180.Harrington, H.J., 1991. Business Process Improvement. New York: McGraw-Hill, Inc.

. Murnawan, Heri., Mustofa. 2014. Perencanaan Produktivitas Kerja Dari HasilEvaluasi Produktivitas Dengan Metode Fishbone Di Perusahaan Percetakan Kemasan Pt.X. Jurnal Teknik Industri HEURISTIC Vol 11 No 1 April 2014. Prodi Teknik Industri FT Universitas 17 Agustus 1945 Surabaya.

. Object Management Group, 2011. Business Process Model and Notation (BPMN). [pdf] Tersedia di [Diakses pada 11 November 2019]

. Perdana T, Nurhayati, Kusnandar. (2013). Improvement Model of Supply Chain Management and Agribusiness Cluster of Red Chili: an Experience in West Java. The Article was presented in International Workshop of Agri Supply Chain Management on July 1st, 2013 at Hotel Mer- cure Surabaya, Indonesia. In Collaboration Between University of Jember and University Putra Malaysia.

. Pratama, I., Pramono, D., Setiawan, Yudi., 2018. Perbaikan Proses Bisnis Menggunakan Metode Business Process Improvement (BPI) (Studi Kasus Pada Bagian Pelaksana Urusan Logistik UTD Palang Merah Indonesia (PMI) Kota Malang). Jurnal Pengembangan Teknologi Informasi dan Ilmu Komputer.

. Pojasek, Robert B, 2000. Enviromental Quality Management. ABI/INFORM Trade & Industry.

. Porter, M., 1998. Competitive Advantage: Creating and Sustaining Superior Performance. New York: The Free Press.

. Serrat, O., 2009. The Five Whys Technique. s.l.:Knowledge Slutions.

. Undang Undang Nomor 18 tahun 2008 tentang Pengelolaan Sampah.

. Weske, M., 2012. Business Process Management, Second Edition. London: Springer.

. Zhu, Q., Sarkis, J. and Geng, Y., Green Supply Chain Management in China: Pressures, Practices and Performance, International Journal of Operations & Production Management, 25(5), 2005, pp. 449-468.

. Zhu, Q., Sarkis, J. and Lai, K., Green Supply Chain Management Implications for Closing The Loop‟, Transportation Research Part E, 44, 2008, pp. 1–18.




DOI: https://doi.org/10.31334/logistik.v4i1.874

Refbacks

  • There are currently no refbacks.


Copyright (c) 2020 Jurnal Logistik Indonesia

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

View My Stats

____________________________________________

Jurnal Logistik Indonesia

ISSN 2579-8952 (media cetak), 2621-6442 (media online)

Email : [email protected]/[email protected]

Website: http://ojs.stiami.ac.id/index.php/logistik

INDEKS BY: