|
Issue |
Title |
|
Vol 8, No 1: April 2024 |
Redesign Layout of Production Facilities Using Systematic Layout Planning and ARC Methods at UMKM Bill Bakerykoe |
Abstract
PDF
|
Hikmah Sekarningtyas, Iqbal Faza, Rohmad Kafidzin, Iwan Prasetyo |
|
Vol 8, No 2: Oktober 2024 |
Implementation of the Saving Matrix and Nearest Neighbor Methods in Planning Courier Route for Package Distribution in the Kudus Area |
Abstract
PDF
|
Hikmah Sekarningtyas, Eka Noviana |
|
Vol 8, No 1: April 2024 |
The Influence of Internal Control of Raw Material Inventory and Production Process Planning on the Smoothness of the Production Process in the Production Department of PT. Hogy Indonesia Cibitung |
Abstract
PDF
|
Laode Sabarudin |
|
Vol 5, No 1: April 2021 |
EVALUASI SISTEM PENGENDALIAN INTERNAL BAHAN BAKU PRODUKSI PADA UD. XYZ DI SIDOARJO |
Abstract
PDF
|
Darno Darno, Anita Anita, Jaya Adi Gama Tengtarto, Kuswana Rama, Camelia Dewi R |
|
Vol 8, No 1: April 2024 |
The Effect of Just in Time Method on Inventory Control in Children's Clothing Production Companies |
Abstract
PDF
|
Sutandi Sutandi, Juviana Juviana |
|
Vol 7, No 2: Oktober 2023 |
The Effect of Winding Yarn (Just In Time) on Winding Machine Productivity |
Abstract
PDF
|
Sandi Noorzaman, Rachmat Hidayat |
|
Vol 2, No 2: Oktober 2018 |
MENENTUKAN JUMLAH PRODUKSI KAYU BARE CORE MENGGUNAKAN METODE PERENCANAAN ZERO INVENTORY |
Abstract
PDF
|
Widiyarini Widiyarini |
|
1 - 7 of 7 Items |
|