Soft System Methodology (SSM): Kebijakan Procurement dalam Proyek Pemerintah Berbasis APBN/APBD
DOI:
https://doi.org/10.31334/transparansi.v7i2.4848Keywords:
design & build Integrasi desain kinerja proyek procurementAbstract
Kebijakan procurement dalam proyek pemerintah dengan skema pembiayaan APBN/APBD harus dipisahkan dalam berbagai project delivery system. Penelitian ini bertujuan untuk memetakan kebijakan procuremet pada proyek pemerintah dengan project delivery system Design & Build (DB), melalui study literatur dari penelitian terdahulu yang akan diolah dengan SSM (soft system methodology) penelitian ini akan memetakan kebijakan procurement dalam proyek DB. Penelitian ini akan bermanfaat sebagai masukan dalam penyusunan kebijakan procurement proyek DB pemerintah dengan skema APBN/APBD. Procurement policies in government projects with APBN/APBD financing schemes must be separated into various project delivery systems. This study aims to map procurement policies in government projects with the Design & Build (DB) project delivery system, through literature studies from previous studies that will be processed with SSM (soft system methodology) this study will map procurement policies in DB projects. This study will be useful as input in compiling procurement policies for government DB projects with the APBN/APBD scheme.References
Y. Liu et al., “Improving design by partnering in engineering– procurement–construction (EPC) hydropower projects: A case study of a large-scale hydropower project in china,†Water (Switzerland), vol. 13, no. 23, 2021, doi: 10.3390/w13233410.
I. Ndekugrp and A. Turner, “Building Procurement By Design And Build Approach.â€
W. S. Hui, R. Othman, N. H. Omar, R. A. Rahman, and N. H. Haron, “Procurement issues in Malaysia,†International Journal of Public Sector Management, vol. 24, no. 6, pp. 567–593, Aug. 2011, doi: 10.1108/09513551111163666.
J. Nyström, “Partnering; definition, theory and the procurement phase,†2005.
R. Pal, P. Wang, and X. Liang, “The critical factors in managing relationships in international engineering, procurement, and construction (IEPC) projects of Chinese organizations,†International Journal of Project Management, vol. 35, no. 7, pp. 1225–1237, Oct. 2017, doi: 10.1016/j.ijproman.2017.05.010.
M. El Asmar, M. Asce, A. S. Hanna, F. Asce, and W.-Y. Loh, “Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems,†2013, doi: doi:10.1061/(asce)co.1943-7862.0000744.
Shankar Ganesan, “Determinants of Long-Term Orientation in Buyer-Seller Relationships,†1994.
T. G. Crane, J. P. Felder, P. J. Thompson, M. G. Thompson, S. R. Sanders, and A. Member, “Partnering Measures,†1997. doi: https://doi.org/10.1061/(ASCE)0742-597X(1999)15:2(37).
P. J. Thompson’, S. R. Sanders, and A. Member, “Parlnering Continuum,†1998.
R. J. Ruitenburg, A. J. J. Braaksma, and L. A. M. Van Dongen, “A multidisciplinary, expert-based approach for the identification of lifetime impacts in Asset Life Cycle Management,†in Procedia CIRP, Elsevier B.V., 2014, pp. 204–212. doi: 10.1016/j.procir.2014.07.007.
I. M. Katar, “Enhancing the Project Delivery Quality; Lean Construction Concepts of Design-Build & Design-Bid-Build Methods,†International Journal of Management, vol. 10, no. 6, pp. 324–337, 2019, doi: DOI: 10.34218/IJM.10.6.2019.031.
B. Xia, Q. Chen, Y. Xu, M. Li, and X. Jin, “Design-Build Contractor Selection for Public Sustainable Buildings,†Journal of Management in Engineering, vol. 31, no. 5, Sep. 2015, doi: 10.1061/(asce)me.1943-5479.0000295.
D. R. Hale, P. P. Shrestha, M. Asce, ; G Edward Gibson, F. Asce, and G. C. Migliaccio, “Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methodsâ€, doi: 10.1061/ASCECO.1943-7862.0000017.
D. E. Salla, “Comparing Performance Quality of Design-Bid-Build (DBB) and Design-Build (DB) Project Delivery Methods in Nigeriaâ€, doi: 10.11113/ajees.v3.n1.104000.
J. Park and Y. H. Kwak, “Design-Bid-Build (DBB) vs. Design-Build (DB) in the U.S. public transportation projects: The choice and consequences,†International Journal of Project Management, vol. 35, no. 3, pp. 280–295, Apr. 2017, doi: 10.1016/j.ijproman.2016.10.013.
J. Sullivan, M. El Asmar, J. Chalhoub, and H. Obeid, “Two Decades of Performance Comparisons for Design-Build, Construction Manager at Risk, and Design-Bid-Build: Quantitative Analysis of the State of Knowledge on Project Cost, Schedule, and Quality,†J Constr Eng Manag, vol. 143, no. 6, Jun. 2017, doi: 10.1061/(asce)co.1943-7862.0001282.
V. Nikou Goftar, M. El Asmar, and E. Bingham, “A Meta-Analysis of Literature Comparing Project Performance between Design-Build (DB) and Design-Bid-Build (DBB) Delivery Systems.â€
M. El Asmar, W. Lotfallah, G. Whited, M. Asce, A. S. Hanna, and F. Asce, “Quantitative Methods for Design-Build Team Selectionâ€, doi: 10.1061/ASCECO.1943-7862.0000194.
E. W. M. Lam, A. P. C. Chan, and D. W. M. Chan, “Benchmarking design-build procurement systems in construction,†2004, Emerald Group Publishing Ltd. doi: 10.1108/14635770410538763.
E. Murtiana Sari, A. Purna Irawan, M. Agung Wibowo, and O. Sinaga, “Applying Soft Systems Methodology To Identified Factors Of Partnerships Model In Construction Project-Palarch’s,†2020.
S. V. Shrivastava and U. Rathod, “A risk management framework for distributed agile projects,†Inf Softw Technol, vol. 85, pp. 1–15, May 2017, doi: 10.1016/j.infsof.2016.12.005.
G. G. Roy, “A Risk Management Framework for Software Engineering Practice,†2004.
S. O. Ajayi, “Design, Procurement And Construction Strategies For Minimizing Waste In Construction Projects,†2016.
A. Lesniak, E. Plebankiewicz, and K. Zima, “Design and build procurement system - Contractor selection,†Archives of Civil Engineering, vol. 58, no. 4, pp. 463–476, Dec. 2012, doi: 10.2478/v.10169-012-0025-9.
A. P. C. Chan, D. Scott, and E. W. M. Lam, “Framework of Success Criteria for DesignÕBuild Projects,†Management Engineering, vol. 18, no. 3, pp. 120–128, 2002, doi: 10.1061/ASCE0742-597X200218:3120.
A. P. C. Chan and A. P. L. Chan, “Key performance indicators for measuring construction success,†2004. doi: 10.1108/14635770410532624.
I. Ndekugrp and A. Turner, “Building Procurement By Design And Build Approach,†1994.
K. R. Molenaar, N. Sobin, and E. I. Antillón, “A Synthesis Of Best-Value Procurement Practices For Sustainable Design-Build Projects In The Public Sector,†2023. [Online]. Available: http://meridian.allenpress.com/jgb/article-pdf/5/4/148/2193488/jgb_5_4_148.pdf
J. S. Russell and E. J. Jaselskis, “Predicting Construction Contractor Failure Prior To Contract Award,†1992.
P. Kakwezi and S. Nyeko, “Procurement Processes And Performance: Efficiency And Effectiveness Of The Procurement Function,†Int Journal of Social Sciences Management and Entrepreneurship, vol. 3, no. 1, pp. 172–182, 2019, [Online]. Available: www.sagepublishers.com
R. Ruparathna and K. Hewage, “Review of Contemporary Construction Procurement Practices,†Journal of Management in Engineering, vol. 31, no. 3, May 2015, doi: 10.1061/(asce)me.1943-5479.0000279.
J. Lynch, “Public Procurement: Principles, Categories and Methods.†[Online]. Available: http://leanpub.com/procurement-principles-categories-and-methods
A. Sitompul, “E-Procurement System In The Mechanism Of Procurement Of Goods And Services Electronically.â€
A. Fath et al., “Readiness for Implemented Sustainable Procurement in Indonesian Government Construction Readiness for Implemented Sustainable Procurement in Indonesian Government Construction Project,†2024, doi: 10.3390/buildings14051424.
E. M. Sari et al., “Challenge and Awareness for Implemented Integrated Project Delivery (IPD) in Indonesian Projects,†Buildings, vol. 13, no. 1, 2023, doi: 10.3390/buildings13010262.
P. Hong and H.-B. Kwon, “Emerging issues of procurement management: a review and prospect,†2012.
E. Uyarra and K. Flanagan, “Understanding the innovation impacts of public procurement,†European Planning Studies, vol. 18, no. 1, pp. 123–143, Jan. 2010, doi: 10.1080/09654310903343567.
J. Grandia and J. Meehan, “Public procurement as a policy tool: using procurement to reach desired outcomes in society,†International Journal of Public Sector Management, vol. 30, no. 4, pp. 302–309, 2017, doi: 10.1108/IJPSM-03-2017-0066.
E. Sari, A. Irawan, and M. Wibowo, “Design Partnering Framework to Reduce Financial Risk in Construction Projects,†European Alliance for Innovation n.o., Sep. 2022. doi: 10.4108/eai.31-3-2022.2320722.
A. Bigwanto, N. Widayati, M. A. Wibowo, and E. M. Sari, “Lean Construction: A Sustainability Operation for Government Projects,†Sustainability, vol. 16, no. 8, p. 3386, Apr. 2024, doi: 10.3390/su16083386.
E. Murtiana Sari, A. Purna Irawan, M. Agung Wibowo, and A. Kusuma Among Praja, “Partnering Tools To Achieve Lean Construction Goals,†2021.
M. Nahdi, N. Widayati, M. A. Wibowo, E. M. Sari, R. Z. Tamin, and A. Thohirin, “Examining Solicited Projects of Public–Private Partnerships (PPP) in the Initiative of Indonesian Government,†Buildings, vol. 14, no. 6, Jun. 2024, doi: 10.3390/buildings14061870.
E. M. Sari et al., “Design bid build to integrated project delivery: Strategic formulation to increase partnering,†Journal of Infrastructure, Policy and Development, vol. 8, no. 1, Dec. 2023, doi: 10.24294/jipd.v8i1.2242.
N. Original Citation Thurairajah, R. Haigh, and D. D. G. Amaratunga, “Achieving excellence in construction,†2005.
J. S. Shane et al., “Legal Challenge to a Best-Value Procurement System,†2015.
M. Calahorra-Jimenez, K. Molenaar, C. Torres-Machi, A. Chamorro, and L. F. Alarcón, “Structured Approach for Best-Value Evaluation Criteria: US Design–Build Highway Procurement,†Journal of Management in Engineering, vol. 36, no. 6, Nov. 2020, doi: 10.1061/(asce)me.1943-5479.0000857.
D. Tran, K. R. Molenaar, and D. D. Gransberg, “Implementing best-value procurement for design-bid-build highway projects,†Transp Res Rec, vol. 2573, pp. 26–33, 2016, doi: 10.3141/2573-04.
K. R. Molenaar, N. Sobin, and E. I. Antillón, “A Synthesis Of Best-Value Procurement Practices For Sustainable Design-Build Projects In The Public Sector.†[Online]. Available: http://meridian.allenpress.com/jgb/article-pdf/5/4/148/2193488/jgb_5_4_148.pdf
D. Q. Tran, K. R. Molenaar, and B. Kolli, “Implementation of best-value procurement for highway design and construction in the USA,†Engineering, Construction and Architectural Management, vol. 24, no. 5, pp. 774–787, 2017, doi: 10.1108/ECAM-03-2016-0073.
T. Da, C. L. Alves, and N. Shah, “Analysis of Construction Contracts: Searching for Collaboration.â€
P. J. O’ Connor, “Integrated Project Delivery: Collaboration Through New Contract Forms,†2009. [Online]. Available: www.aia.org.
Z. Ma, D. Zhang, and J. Li, “A dedicated collaboration platform for Integrated Project Delivery,†Autom Constr, vol. 86, 2018, doi: 10.1016/j.autcon.2017.10.024.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License
Please find the rights and licenses in Transparansi : Jurnal Ilmiah Ilmu Administrasi By submitting the article/manuscript of the article, the author(s) agree with this policy. No specific document sign-off is required.
- License
The commercial use of the article will be governed by the Creative Commons Attribution license as currently displayed on Creative Commons Attribution-ShareAlike 4.0 International License.
2. Author(s)' Warranties
The author warrants that the article is original, written by stated author(s), has not been published before, contains no unlawful statements, does not infringe the rights of others, is subject to copyright that is vested exclusively in the author and free of any third party rights, and that any necessary written permissions to quote from other sources have been obtained by the author(s).
3. User Rights
Transparansi : Jurnal Ilmiah Ilmu Administrasi spirit is to disseminate articles published are as free as possible. Under the Creative Commons license, Transparansi : Jurnal Ilmiah Ilmu Administrasi permits users to copy, distribute, display, and perform the work for non-commercial purposes only. Users will also need to attribute authors and Transparansi : Jurnal Ilmiah Ilmu Administrasi on distributing works in the journal and other media of publications.
4. Co-Authorship
If the article was jointly prepared by more than one author, any authors submitting the manuscript warrants that he/she has been authorized by all co-authors to be agreed on this copyright and license notice (agreement) on their behalf, and agrees to inform his/her co-authors of the terms of this policy. Transparansi : Jurnal Ilmiah Ilmu Administrasi will not be held liable for anything that may arise due to the author(s) internal dispute. Transparansi : Jurnal Ilmiah Ilmu Administrasi will only communicate with the corresponding author.
5. Miscellaneous
Transparansi : Jurnal Ilmiah Ilmu Administrasi will publish the article (or have it published) in the journal if the article’s editorial process is successfully completed. Transparansi : Jurnal Ilmiah Ilmu Administrasi editors may modify the article to a style of punctuation, spelling, capitalization, referencing and usage that deems appropriate. The author acknowledges that the article may be published so that it will be publicly accessible and such access will be free of charge for the readers as mentioned in point 3.
Every accepted manuscript should be accompanied by "Copyright Transfer Agreement"prior to the article publication.