ANALISIS PERENCANAAN BAHAN BAKU DI UD. AA DENGAN MENERAPKAN METODE MATERIAL REQUIREMENT PLANNING (MRP)
Abstract
Keywords
Full Text:
PDFReferences
Bahagia, Senator Nur, 2003, Sistem Inventori, Laboratorium Perencanaan Optimal Sistem Produksi,
Departemen Teknik Industri, ITB
Heizer, J., & Render, B. (2010). Manajemen operasi. Jakarta: Salemba Empat..
Huseina, A. F., & Saptadi, S. (2018). PENGENDALIAN PERSEDIAAN RAW MATERIAL METAL
DENGAN METODE EOQ Studi Kasus PT DIRGANTARA INDONESIA. Industrial Engineering Online Journal, 7(3).
Kholidasari, I., Setiawati, L., Tartila, T. (2019). The implementation of forecasting method by
incorporating human judgment. International Journal on advanced Science Engineering Information Technology, 9 (6), 1982-1988.
Makridakis, S., Wheelwright, S. C., & Hyndman, R. J. (2008). Forecasting methods and applications.
John wiley & sons.Nasution, A. H., & Prasetyawan, Y. (2008). Perencanaan dan Pengendalian Produksi, Graha Ilmu.
Rangkuti, F. (2007). Manajemen Persediaan Aplikasi di Bidang Bisnis Edisi 2 Cetakan 5. PT Raja
Grafindo Persada. Jakarta. Indonesia.
SUNDARI, S., & NEGARA, S. W. (2017). Analisis Pengendalian Persediaan Bahan Baku Jenis Gelas
mL dengan Metode EOQ (Economic Order Quantity) di PT. Trijaya Tirta Dharma. Industrika, 1(1).
Trio Mona Purnama. 2002. Perencanaan Sistem Persediaan Bahan Baku Pada CV. Hanifa Perabot
Tersine, R. J. (1994). Principles of Inventory and Materials Management. New Jersey: PTR Prentice-
Hall.
DOI: https://doi.org/10.31334/logistik.v5i1.1180
Refbacks
- There are currently no refbacks.
Copyright (c) 2020 Jurnal Logistik Indonesia
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
View My Stats
____________________________________________
Jurnal Logistik Indonesia
ISSN 2579-8952 (media cetak), 2621-6442 (media online)
Email : [email protected]/[email protected]
Website: http://ojs.stiami.ac.id/index.php/logistik