|
Issue |
Title |
|
Vol 4, No 2: Oktober 2020 |
Evaluasi Keterlambatan Pengiriman Barang dengan Menggunakan Metode Six Sigma |
Abstract
PDF
|
Somadi Somadi |
|
Vol 4, No 1: April 2020 |
Evaluasi Proses Pengadaan Barang Menggunakan Metode Value Stream Mapping pada Perusahaan Minyak dan Gas |
Abstract
PDF
|
Angel Olivia Benedikta, Iwan Sukarno |
|
Vol 5, No 1: April 2021 |
EVALUASI SISTEM PENGENDALIAN INTERNAL BAHAN BAKU PRODUKSI PADA UD. XYZ DI SIDOARJO |
Abstract
PDF
|
Darno Darno, Anita Anita, Jaya Adi Gama Tengtarto, Kuswana Rama, Camelia Dewi R |
|
Vol 5, No 2: Oktober 2021 |
Evaluation of Chicken Eggs Supply With Fuzzy AHP Approach Through Development of Safea Software |
Abstract
PDF
|
Agung Prayudha Hidayat, Sesar Husen Santosa, Ridwan Siskandar, Ringga Gilang Baskoro |
|
Vol 6, No 2: Oktober 2022 |
Factors Influencing Switching Intention of Medical Waste Bin with Push Pull Mooring Approach |
Abstract
PDF
|
Aditya Gaffar, Mirna Lusiani, Yelita Anggiane Iskandar |
|
Vol 1, No 1: April 2017 |
FAKTOR-FAKTOR RISIKO RISIKO DALAM PERUSAHAAN JASA PENGIRIMAN |
Abstract
PDF
|
Resista Vikaliana |
|
Vol 8, No 1: April 2024 |
Feasibility Analysis of Rumah Produksi Bersama (RPB) for Chili Commodities as Investment Promotion in Batubara Regency, North Sumatra |
Abstract
PDF
|
Heri Susanto, Anak Agung Eka Suwarnata, Nina Ariesta, Faizal Maad |
|
Vol 6, No 2: Oktober 2022 |
Freight Train Scheduling using Integer Linear Programming: A case study of cement distribution |
Abstract
PDF
|
Nur Layli Rachmawati, Dian Permana Putri |
|
Vol 7, No 2: Oktober 2023 |
Implementation of Warehouse Receipt System in Food Warehouses in Kudus District |
Abstract
PDF
|
Iqbal Faza, Hikmah Sekarningtyas, Titi Yuni Arti, Eka Noviana |
|
Vol 7, No 1: April 2023 |
Increasing Productivity Using Define, Measure, Analyze, Improve, Control (DMAIC) at PT. XYZ (a Case in Indonesian Company) |
Abstract
PDF
|
Adji Candra Kurniawan, Fiki Rohmatul Maula, Nur Layli Rachmawati |
|
Vol 6, No 1: APRIL 2022 |
Influence of Integrated Marketing Communication on Customer Loyalty Survey at CV. Fashion Ponokawan Village, Krian District, Sidoarjo Regency, East Java Province”, Indonesia |
Abstract
PDF
|
Nurul Laili Fittriya, Rizka Rahma Amalia |
|
Vol 4, No 1: April 2020 |
Inventory and Sales Information System Design on Clothing Store (Case Study: X Fashion, Jakarta) |
Abstract
PDF
|
Yulia Rosa, Marsellinus Bachtiar Wahju |
|
Vol 5, No 2: Oktober 2021 |
Inventory Cost Reduction and EOQ for Personal Protective Equipment: A Case Study in Oil and Gas Company |
Abstract
PDF
|
Andian Ari Istiningrum, Sono Sono, Virgy Andika Putri |
|
Vol 7, No 1: April 2023 |
Is Employee Turnover Intention Determined By Career Growth, Affective, Normative, and Continuance?: A Study on the Waste Treatment Industry |
Abstract
PDF
|
Ikramina Larasati Hazrati havidz, Anik Rahmawati, Tantri Yanuar Rahmat Syah, Rojuaniah Rojuaniah, Ihlas Cahyadi |
|
Vol 7, No 2: Oktober 2023 |
Is Turnover Intention of Waste Industry Employees Determined by Career Growth, Affective, Normative and Continuance? |
Abstract
PDF
|
Anik Rahmawati, Ikramina Larasati Hazrati Havidz, Ihlas Cahyadi |
|
Vol 1, No 1: April 2017 |
KAJIAN KESIAPAN SDM LOGISTIK MENGHADAPI ERA MEA |
Abstract
PDF
|
Fino Wahyudi Abdul, Cundo Harimurti, Resista Vikaliana |
|
Vol 3, No 1: April 2019 |
KAJIAN LITERATUR WAREHOUSE 4.0 : DAMPAK INDUSTRI 4.0 TERHADAP MANAJEMEN PERGUDANGAN |
Abstract
PDF
|
I Nyoman Purnaya |
|
Vol 4, No 1: April 2020 |
Kapasitas Infrastruktur dan Fasilitas pada Kereta Api Angkutan Barang dan Logistik |
Abstract
PDF
|
Abi Prasidi, Muhamad. Rifni |
|
Vol 3, No 2: Oktober 2019 |
Ketepatan Pengaruh Manajemen Logistik Terhadap Tingkat Kepuasan Pelanggan PT. Bhinneka Bajanas Cabang Cikarang |
Abstract
PDF
|
Yosephyn Patria Larici, Fino Wahyudi Abdul |
|
Vol 3, No 2: Oktober 2019 |
Ketepatan Waktu Pendistribusian Barang Pada Warehouse Management System di PT. CEVA Logistics Tahun 2019 |
Abstract
PDF
|
Abi Prasidi, Lis Lesmini |
|
Vol 5, No 2: Oktober 2021 |
Last Mile Delivery Collaboration Proposal to Achieve Delivery Cost Efficiency in E-Commerce |
Abstract
PDF
|
Sutandi Sutandi, Yuli Evitha, I Nyoman Purnaya |
|
Vol 2, No 1: April 2018 |
LEAN MANUFACTURING IMPLEMENTATION IN INVENTORY CONTROL AS A REPAIR PROCESS |
Abstract
PDF
|
Fino Wahyudi Abdul |
|
Vol 7, No 1: April 2023 |
Location Design of GIS-Based Temporary Evacuation Sites (TES) by Considering the COVID-19 Pandemic Situation: A Case Study in Padang City) |
Abstract
PDF
|
Rahmad Inca Liperda, Iwan Sukarno, Natasha Utami Syave Yenda |
|
Vol 4, No 1: April 2020 |
Manfaat dan Dampak Digitalisasi Logistik di Era Industri 4.0 |
Abstract
PDF
|
Erwin Raza, La Ode Sabaruddin, Aziza Leila Komala |
|
Vol 6, No 2: Oktober 2022 |
Material Handling Equipment Selection Using Analytical Hierarchy Process (AHP) Method |
Abstract
PDF
|
Denok Ramadhan Setiyani, Iwan Sukarno |
|
26 - 50 of 106 Items |
<< < 1 2 3 4 5 > >> |